RECONSTRUCTION OF ISHIM RIVER BRIDGE
COME BACK

RECONSTRUCTION OF ISHIM RIVER BRIDGE

IN BATIR STREET IN ASTANA CITY

LOCATION

Astana, Kazakhstan

About the Project

About the Project

Reconstruction of Ishim River Bridge in Batır Street in Astana City; Construction work for steel bridge with diagonal arch and guy rope.

Main Work Quantities

  • Steel Bridge: L=130,00 m, WIDTH=33,20 m (BRIDGE AREA=4316 m2)
  • Amount of Steel: 3.495,000 tons
  • Amount of Asphalt: 1.872,000 tons