BEKIRPAŞA (KOCAELI) DISASTER-VICTIM
COME BACK

BEKIRPAŞA (KOCAELI) DISASTER-VICTIM

TECHNICAL INFRASTRUCTURE CONSTRUCTION

LOCATION

Kocaeli, Türkiye

About the Project

About the Project

Construction work for Bekirpaşa (Kocaeli) Disaster-Victim Permanent Earthquake Residences  3rd Region Technical Infrastructure, Side streets and avenues of Bekirpaşa Disaster-Victim Permanent Earthquake Residences of Kocaeli Municipality.

  • Main Work Quantities 
  • Excavation: 769.341,882 m3 
  • Fill: 80.901,198 m3
  • Sub-Base Construction: 114.635,329 m3 
  • Plant Mix Base: 57.347,050 tons 
  • Plant Mix Sub-base: 29.367,940 tons
  • Binder Course: 12.584,750 tons 
  • Wearing Course: 6.905,130 tons
  • Prefabricated Concrete Parquet Construction: 70.325,190 m2
  • Prefabricated Concrete Curb Construction: 37.926,270 metres
  • Sewer Pipe: 12.463,630 metres 
  • Rainwater pipe: 5.313,630 metres
  • Domestic water pipe: 13.405,190 metres