About the Project

Torbali-Odemis-Kiraz Road km 52+450-79+350 Grading, Engineering Structures, Superstructure and HBM Works
2nd REGIONAL DIRECTORATE OF HIGHWAYS/IZMIR
information;
- Km 52+450 - 79+350
- Total Path Length : 26.900,00 m
hyperlinks;
- Uzundere Bridge : Tek Açıklıklı 22,95 m uzunluğunda
- Gelinboz Bridge : İki Açıklıklı 32,90 m uzunluğunda
- Paid DDY Bridge : Üç Açıklıklı 54,50 m uzunluğunda
- Ø120 Pile Construction : 3680,00 m
- Ø100 Pile Construction : 3236,00 m
- Road Excavation : 2.131.800,000 m3
- Filling Execution : 1.240.570,000 m3
- Concrete : 67.647,000 m3
- PMAT+PMT : 948.400,000 ton
- Bituminous Foundation : 191.820,000 ton
- Binder : 170.112,000 ton
- Wearing : 80.064,000 ton