TORBALI-ODEMIS-KIRAZ ROAD GRADING
COME BACK

TORBALI-ODEMIS-KIRAZ ROAD GRADING

SUPERSTRUCTURE AND HBM WORK

LOCATION

Izmir, Türkiye

PROJECT AREA

26,9 Km

About the Project

About the Project

Torbali-Odemis-Kiraz Road km 52+450-79+350 Grading, Engineering Structures, Superstructure and HBM Works

2nd REGIONAL DIRECTORATE OF HIGHWAYS/IZMIR

information;

  • Km 52+450 - 79+350
  • Total Path Length : 26.900,00 m

hyperlinks;

  • Uzundere Bridge : Tek Açıklıklı 22,95 m uzunluğunda
  • Gelinboz Bridge : İki Açıklıklı   32,90 m uzunluğunda
  • Paid DDY Bridge : Üç Açıklıklı   54,50 m uzunluğunda 
  • Ø120 Pile Construction : 3680,00 m
  • Ø100 Pile Construction : 3236,00 m
  • Road Excavation : 2.131.800,000 m3
  • Filling Execution : 1.240.570,000 m3
  • Concrete : 67.647,000 m3
  • PMAT+PMT : 948.400,000 ton
  • Bituminous Foundation : 191.820,000 ton
  • Binder : 170.112,000 ton
  • Wearing : 80.064,000 ton