KOCAELI-GOLCUK EARTHQUAKE
COME BACK

KOCAELI-GOLCUK EARTHQUAKE

ZONES ROAD CONSTRUCTION

LOCATION

Kocaeli, Türkiye

About the Project

About the Project

Construction work for Access Road of Permanent Settlement Areas in Earthquake Zones (3rd Group) in Kocaeli-Gölcük. İzmit - Yalova state road between KM 5+278-19+500 and construction work for divided road with 2x2 lanes between sections 21+500-24+180. Construction of 5 bridge crossings Gölcük 1st Access Road between KM 0+000-1+573 (with 2X2 lanes) 

  • Main Work Quantities 
  • Earth Works: 3.063.104,000 m3 
  • Rock Fill: 381.595,000 m3 
  • Granular Fill: 744.578,000 m3 
  • Plant Mix Base: 894.636,000 tons 
  • Bituminous base: 188.010,000 tons 
  • Binder Course: 180.705,000 tons 
  • Wearing Course: 1.958,000 tons  
  • Pre-stressed Girder Bridges: 10 pieces (9409 m2) 
  • Pedestrian Over Pass Bridges: 6 pieces 
  • Bored Pile Execution: 15.685,00 metres
  • Jer Grouting Work: 89.545,00 metres