NOVI PAZAR - TUTIN
COME BACK

NOVI PAZAR - TUTIN

ROAD CONSTRUCTION

LOCATION

Novi Pazar, Serbia

PROJECT AREA

Km: +20,534

About the Project

About the Project

SERBIA INFRASTRUCTURE

Project Name: Novi Pazar - Detailed regulation plan for the reconstruction of Tutin Highway - design and preparation of technical documentation

  • Novi Pazar - Tutin Road Construction Km: 4 + 355,10 - Km: 24 + 889,56
  • Length of the road: 20534,16 meters
  • Road Width: 6.00 meters
  • Road Type: 1x2
  • Excavation: 113000 m3
  • InFilling: 45195 m3
  • Reinforced Concrete Works: 6700 m3
  • Ø 90 Bored Pile: 2068 meters
  • Wearing layer: 5348 tons
  • Construction of Bituminous treated base: 21053 tons
  • Base course 2988 m3
  • Sub-base layer: 38820 m3

Bridge:

  • 6 + 700 Stream bridge 17.25 meters