About the Project

Scope of the Work: Pendik – Kaynarca conjunction and TCDD underpass extension construction, building 4 bridges as well as divided road with 2x2 lane 7514 metres in length.
Construction of 4 bridges along with divided road with 2x2 lane, which is 7514 metres in length.
- Main Work Quantities
- Excavation: 101.430,000 m³
- Fill: 96.584,000 m³
- Pre-stressed Girder Bridge: 4 Ad.(14.373 m²
- Bored Pile Execution: 23.913,00 metres
- Plant Mix Base: 36.360,000 tons
- Binder Course: 311.789,000 tons
- Wearing Course: 9.929,000 tons