The route between Laçin and Kırkdilim on the Çorum - Osmancık Line is a state road connecting the districts of Çorum, Kırkdilim, Laçin and Osmancık, which are part of the General Directorate of Highways network.
The 8.62 km-long divided road section of the Çorum - Osmancık Route between Laçin and Kırkdilim includes earthworks, tunnels, engineering structures, and superstructure works. The Kırkdilim settlement is located north of the Çorum city centre, approximately 21 km away.
The Kırkdilim Passage on the Çorum - Laçin Provincial Road constitutes the only mountainous section of this route (K.K.No 19-81). The aforementioned passage, located on the Yozgat - Çorum - Sinop route, is of importance as it forms part of the north-south axis.
- Contract Date: 24.01.2018
- Km: 17+738 - 26+353.18
- Total Road Length: 8.62 m
Tunnel;
- T1 Tunnel Right Tube: 1,371.94 m
- T1 Tunnel Left Tube: 1,406.48 m
- T2 Tunnel Right Tube: 1,100.02 m
- T2 Tunnel Left Tube: 1,197.67 m
- T3 Tunnel Right Tube: 1,527.76 m
- T3 Tunnel Left Tube: 1,578.26 m
- Total Tunnel Length: 8,182.13 m
- Road Excavation: 629,585,000 m3
- Tunnel Excavation: 823,876,000 m3
- Filling: 251,225,000 m3
- Concrete: 183,000,000 m³
- Shotcrete: 115,600,000 m3
- Plant-Mix Subbase + Plant-Mix Base: 380,000,000 tons
- Bituminous Base: 168,421.00 m2
- Binder: 126,316.00 m2
- Abrasion: 105,263.00 m2