ENERGY GROUP
COME BACK

ENERGY GROUP

YAVUZ HYDROELECTRIC POWER PLANT

LOCATION

Amasya, Türkiye

About the Project

About the Project

Project Technical Specifications

  • Installed Power: 3 x 7,50 MWm =22,50 MWm
  • Average Production:82,00 GWh / year
  • Project Flow Rate:106,70 m3/sc

Transmission Channel Characteristics

  • Total Length: 3 235,00 metres
  • Trapeze Type: 1 981,00 metres
  • Vertical Channel Type: 1 254,00 metres
  • Net Head: 23,86 metres
  • Penstock Pipe Diameter: 3 x 3500 mm
  • Regulator Type: 4 x Radial Gate, Concrete Weighted Power House
  • Hydraulic Turbines: 4 x Radial Gate, Concrete Weighted Power House
  • Power House Generators: : 3 x Vertical Axis Synchronous