KONYA-AKŞEHIR ROAD CONSTRUCTION

Earth Works, engineering structures and bituminous hot mixture coating road construction work for Konya – Akşehir Road between (KM: 30 + 000 – 102 + 500). 
Performing earth works and engineering structures construction of 72,5 km road, which was completed in advance as 2x2 at the level of surface treatment starting from Km:30+000 in Konya-Afyon direction of Konya-Ladik-Ilgın-Akşehir-Argıthanı-Afyon road axis up to Km:102+500 Argıthanı exit and construction work for road's binder and wearing courses, bituminous base, which are bituminous hot mixture layers along with  plant mix sub-base and Plant Mix Base layer by removing the current surface treatment layers. 
As part of the tender one overpass (Ilgın Gate to be built with bored pile foundation system with 8,00 m. space, 7 piers, 2 side piers is approximately 800 m. in length  and circa 5102,40 m. Q 100 and 192 pieces of prefabricated beams) and 17 at-grade intersections are available.

Agreement Date: 02.11.2011
Work Completion Date: 18.05.2017

  • ALL
  • PHOTOS
  • VIDEOS