Category

AKŞEHIR - AFYON ROAD CONSTRUCTION

Earth works, engineering structures and bituminous hot mixture etc. road construction work for Akşehir - Afyon road between km: 123+700 - 125+562 G (129+000 I) - 131+500 (Akşehir city gate) and km:157+000 - 221+000. The route consists of Akşehir city gate for 64 km and 4,362 km in total of the road between km: 157+000-221+000 (Afyon- Karahisar- Sultandağı) between Akşehir-Afyon. 
As part of the tender; Excavation: 40000 m3, Fill: 20000 m3, Pmat: 50000 tons, Pmt: 900000 tons, B. Base: 167500 m2, Binder: 1600000 m2, Wearing: 1600000 m2.

 

  • ALL
  • PHOTOS
  • VIDEOS